麻豆精选

East Liverpool Campus 93 kWdc Solar Array (Virtual)

麻豆精选at East Liverpool Campus 93 kWdc Solar PV Array, non-penetrating ballasted system roof mounting consists of 232 solar panels installed by Third Sun Solar in 2021 on Puriton Hall with electricity extending to the building. The minimum 25-year solar electric cost savings to the East Liverpool Campus is expected to be about $40,400 with a reduced carbon footprint of 89 tons of carbon dioxide. This is the equivalent to removing 18 cars from roadways.

NOTE- This is a virtual site on the National Solar tour and is not staffed.

NEWS ARTICLE

East Liverpool Solar Array